Over 43 years international experience
in the Oil and Gas Industry, working onshore and offshore,
Experience in Project Management for exploration and development
drilling, HP/HT, under-balanced drilling using OBM with
nitrogen injection, air and foam Drilling using standard
rotary equipment and air hammers, completion and production
on land operation, Horizontal drilling (with maximum 1,000m.
reach) and maximum deepwater 300m.)
1988 - Present
Independant consultant
to the following companies:
May 10 - Present. Soyuzneftegaz E&P Ltd
Corporate Technical Advisor
Advisor and QC to the Board of Directors on sourcing and
establishing of Company new international investment, included
negotiating Joint Venture partnerships, equipments and preparing
costing and management profile.
Mar 10 - May 10. Shell Exploration, Syria
Technical Well Engineering Advisor
Advisor to Senior Drilling Engineer on well design and contract
preparations for drilling Oil & Gas exploration wells
Feb 08 to 28 Feb 10. Soyuzneftegaz 12 Inc. (SNG) Syria.
Exploration Drilling Manager
Responsible for planning, tendering
for drilling rig and service contracts, budgeting and drilling
of three exploration wells ii Block-12 in Syria.
Reference: Azat Mazitov, General Manager. amazitov@sngsy.com
Jan 06 - Feb 08. Soyuznefetgaz Vostok (SNG Gizzar),
Uzbekistan
Drilling Manager/Head of drilling and workover department.
Responsible for long term Planning,
Budgeting and Drilling appraisal, development oil and gas
wells including horizontal wells in a Stand alone remote operation.
Reference: Artur Rastrogin, President Exploration; Rastrogin@sng.msk.ru
July 04 - Jan 06. SNG Operating, Uzbekistan
Operation Drilling Manager, Drilling and Workover,
Civil Work and
Development operations
Responsible for planning drilling and
workover strategy.
Responsible for drilling Horizontal and Vertical development
wells.
Field development planning.
Reference: Artur Rastrogin, President Exploration, Rastrogin@sng.msk.ru
Jan 02 - July 04. UzPEC Ltd, Uzbekistan
Technical Advisor.
• Technical advisor for drilling
and workover programme on a PSA project for Trinity Energy
UK in conjunction with national oil company.
• In charge of construction of well site locations and
road work.
• Mainly responsibility is planing and converting from
old Russians type operation and completions to Western API
standard.
Reference: Tony Scott General Director. Anthony_C_Scott@compuserve.com
Nov 99 - Nov 01. Occidental de Colombia (OXY), Colombia
Senior Drilling Supervisor.
• On Site, responsible for drilling
operation and related programs. Exploration well.
• Worked with Drilling Engineers to complete Drilling
Programme and equipment requirement.
• Prepared equipment and transport for remote drilling
operation.
• Due to extreme security restrictions all contractors
and operators equipment and materials had to be transported
in convoys with military escort, each convoy consisted of
95 trucks + support vehicles, stretching over 4.6KM. total
of 412 loads were required to complete the mobilisation.
Reference: Edward Bush, Drilling Manager.
Aug 98 - Aug 99. Emerald
Energy, Colombia
Field Drilling Superintendent.
• Completed Re-entry after
Company previous attempt had failed, saving several millions
$ and allowing for production.
• Successfully drilled and completed 1 HP/HT appraisal
well to planned depth at record time and low cost.
Reference: Keith Hewitt, Managing Director.
July 96 - July 98. BPX, Colombia
Drilling Supervisor.
On site in charge of exploration drilling
in the Piedimonte concession, recognised by BP as one of the
most difficult drilling condition in the world.
• In charge of Under Balance Techniques, using OBM with
Nitrogen injection and Air/Foam drilling.
• Responsible for carry out a stringent Environmental
and Public Relation Program.
• While with BP in Colombia, I never had a stuck pipe
situation where we had to back off and side track. BP documents
this as a record for the area.
Reference: Alan Nelson/Tony Stuart, Drilling Managers.
July 95 - July 96. Wintershall Oil Co, Libya
Drilling Superintendent.
• Responsible for Drilling and
Completion of appraisal and development wells.
• Involved in Work-over and Fracking of existing wells.
• Assisted in developing new drilling and coring bit
selection for the area, with a cost saving of over $2 millions
per well in the final face.
• Reference: Helmut Primus, Drilling Manager.
March95-June95 International Petroleum Corporation Libya
Acting Drilling Manager/Superintendent.
• Responsible for setting up the operation to drill
one exploration well.
• Handled tenders and contracts for all services required
for the project.
Reference: Tim Sarney, Operation Manager,
Sept.94-Feb.95 Nimir Petrolium Yemen
Drilling Superintendent.
• Responsible for setting up new land drilling operation,
including accepting the Rig and mobilisation of all Operator
and Contractors equipment and assisting in writing detailed
drilling programme.
• During the period. I was responsible for Rig Auditing
and Safety, including inspection of Sub Sea, Marine and Drilling
equipment on a Drill ship working for the Company.
Reference: Jeff Gamblen, Drilling Manager.
June 94 - Aug 94. International Petroleum Corporation,
Thailand
Drilling Supervisor.
• Was called in to rectify and supervise operational
and drilling problems.
• Solved and completed the HT/HP well, including fishing/recover
a Radioactive Source logging tool.
• Demobilised clients and all of the contractors equipment
back to Singapore in record time. Drill Ship.
• Reference: Jonas Lindval, Operation Manager.
June.93-April.94 Nimir Petroleum Yemen
Drilling Supervisor.
• Involved in initial start up of Nimir’s operation
in Yemen.
• Civil Engineering Survey and mapping of Drilling sites,
entrance roads and Air strips in remote areas of the country.
• A.) Responsible for inspecting and approving two land
drilling rigs.
• B.) Prepared two drilling locations and drilled several
water holes.
• C.) Handled Public Affairs and relationship.
• Supervised the drilling of a ‘Wild Cat’
well with Air and Foam for surface and intermediate section
and water based mud to TD.
Reference: Jeff Gamblen, Operation Manager.
June 89 - May 93. SPDC Shell, Nigeria
Drilling Supervisor
• Experienced on land and swamp rigs, exploration, appraisal
and developing drilling operations, on land and swamp rigs.
• Nominated by Shell (SIPM) to Supervise the drilling
of a relief well after a Blowout on one of the Company land
operation. This well was completed ahead of schedule.
Reference: Drees Vermant/Frank Effeduma, Senior drilling
Engineers
March 89 - May 89. Occidental North Sea
Drilling Supervisor (Night)
• Drilled one appraisal well in East piper Field. Semi
Submersible Rig.
July 88 - Feb 89. Occidental Indonesia
Drilling Supervisor.
• Prepared equipment to drill three (3) 14.000ft. wells
and mobilised with rig from Singapore to Indonesia.
• Drilled three exploration wells offshore Irian Jaya
from a Jack up rig.
• Operation completed ahead of schedule.
Reference: Paul Collier. International Drilling Manager.
Feb 88 - June 88. BP Thailand
Drilling Foreman.
• Drilled two exploration wells
from a Jack up rig.
• Demobilised rig and equipment to Singapore.
Reference: John Prince, BP, UK.
1968 - 1987. Asia, Italy, Malta
Global Marine Drilling Company Operation
• Manager (85-87)
• Operation Superintendent (82-85)
• Toolpusher (4 yrs)
• Derrickman (3 yrs) Driller (4 yrs)
• Marine department (3 yrs)
• Anchor handling and rig maintenance
|